An Efficacious Multi-Objective Fuzzy Linear Programming Approach for Optimal Power Flow Considering Distributed Generation

  • Warid Warid,

    Affiliations Department of Electrical and Electronic Engineering, Faculty of Engineering, Universiti Putra Malaysia, 43400, UPM Serdang, Selangor, Malaysia, Technical Institute Shatra, Southern Technical University, Foundation of Technical Education, Ministry of Higher Education & Scientific Research, Basrah, Iraq, Centre for Advanced Power and Energy Research, Faculty of Engineering, Universiti Putra Malaysia, 43400, UPM Serdang, Selangor, Malaysia

  • Hashim Hizam ,

    hhizam@upm.edu.my

    Affiliations Department of Electrical and Electronic Engineering, Faculty of Engineering, Universiti Putra Malaysia, 43400, UPM Serdang, Selangor, Malaysia, Centre for Advanced Power and Energy Research, Faculty of Engineering, Universiti Putra Malaysia, 43400, UPM Serdang, Selangor, Malaysia

  • Norman Mariun,

    Affiliations Department of Electrical and Electronic Engineering, Faculty of Engineering, Universiti Putra Malaysia, 43400, UPM Serdang, Selangor, Malaysia, Centre for Advanced Power and Energy Research, Faculty of Engineering, Universiti Putra Malaysia, 43400, UPM Serdang, Selangor, Malaysia

  • Noor Izzri Abdul-Wahab

    Affiliations Department of Electrical and Electronic Engineering, Faculty of Engineering, Universiti Putra Malaysia, 43400, UPM Serdang, Selangor, Malaysia, Centre for Advanced Power and Energy Research, Faculty of Engineering, Universiti Putra Malaysia, 43400, UPM Serdang, Selangor, Malaysia

Abstract

This paper proposes a new formulation for the multi-objective optimal power flow (MOOPF) problem for meshed power networks considering distributed generation. An efficacious multi-objective fuzzy linear programming optimization (MFLP) algorithm is proposed to solve the aforementioned problem with and without considering the distributed generation (DG) effect. A variant combination of objectives is considered for simultaneous optimization, including power loss, voltage stability, and shunt capacitors MVAR reserve. Fuzzy membership functions for these objectives are designed with extreme targets, whereas the inequality constraints are treated as hard constraints. The multi-objective fuzzy optimal power flow (OPF) formulation was converted into a crisp OPF in a successive linear programming (SLP) framework and solved using an efficient interior point method (IPM). To test the efficacy of the proposed approach, simulations are performed on the IEEE 30-busand IEEE 118-bus test systems. The MFLP optimization is solved for several optimization cases. The obtained results are compared with those presented in the literature. A unique solution with a high satisfaction for the assigned targets is gained. Results demonstrate the effectiveness of the proposed MFLP technique in terms of solution optimality and rapid convergence. Moreover, the results indicate that using the optimal DG location with the MFLP algorithm provides the solution with the highest quality.

1 Introduction

Over the last decade, multi-objective optimal power flow (MOOPF) solution has gained considerable interest in power utilities because many real-world power system operation issues involve the simultaneous optimization of multiple, competing, and incommensurable objectives [1,2]. This solution is widely considered as an essential tool for system operators to maintain an economical, secure, and reliable operation of modern power systems [3]. At present, interrelated issues, including insufficient reactive power reserve margin, electricity market restructuring, and the increasing exploitation of distributed generation (DG), affect the operation strategies of many meshed power networks. Thus, power system decision makers have to make crucial decisions regarding unfamiliar groups of conflicting objectives. These new conditions have raised the need to develop realistic schemes for the MOOPF solution that incorporate new combinations of objective functions, planner past experiences, additional constraints, an expanded variety of system control variables, as well as DG effect.

As a sign, with the increased exploitation of power systems, frequent blackouts have been recorded worldwide [4]. In many cases, these circumstances have been attributed to insufficient MVAR reserve that results in voltage instability problems [5]. Furthermore, reforming the power sector with rigid economic restrictions, in which systems are operated under stress, also leads to the same pattern of incidents because of inadequate reactive power and voltage support with increased transmission losses [6]. Concurrently, a widespread increase in the penetration of DG technologies has been observed in large interconnected power systems [7]. At present, DG technologies offer economical and technical, benefits such as transmission cost minimization, congestion mitigation, and loss reduction, which can alleviate many harmful effects of the previously mentioned conditions [7,8].

A MOOPF problem is commonly modeled as a large-scale, nonlinear optimization problem with various operational constraints. In recent years, diverse heuristic optimization algorithms have been proposed and employed to solve different MOOPF problems, such as the Pareto-based multi-objective evolutionary algorithms (MOEA) [9], two-layer simulated annealing (TLSA) [10], the differential evolution (DE) algorithm [11], particle swarm optimization (PSO) [1], the enhanced genetic algorithm (EGA) [12], teaching learning-based optimization (TLBO) [13], and the artificial bee colony algorithm (ABC) [2,3].

Despite their theoretical features, these stochastic algorithms exhibit some drawbacks that confine their utilization in MOOPF software for practical power system operation [14,15]. The most serious and known cons of these methods are their algorithmic complexity [16], long computation time [15,17,18], insecure convergence and stagnation problem [2,16,19], and deficiencies in enforcing constraints [17].

In fact, fuzzy set optimization models offer compromise tools that perform such tasks. Using these tools, we can obtain realistic models that deal with given fuzzy objectives based the subjective targets and past experiences of a power system planner [20,21]. The viability of fuzzy set theory in various applications, including power system operation, planning, and control, has been proven; hence, this theory has been receiving increasing attention and has become the choice of many of electrical engineers [22]. In particular, fuzzy set theory is efficacious in solving MOOPF optimization problems [21]. This feature is attributed to its capability to coordinate various competence and incommensurable objectives of the optimization problem and provide a unique solution that successfully achieves the objectives of system planners. Consequently, a decision-making approach is not required to identify a compromise solution. Moreover, when fuzzy set theory is properly modeled, a considerable reduction in computational time can be achieved, which makes this approach applicable to real-time power system operations [20]. In recent years, only a few studies have documented the solution to the MOOPF problem using fuzzy logic approaches. El Sehiemy et al. [21] solved the MOOPF problem using a fuzzy-based technique by considering the minimization of reactive power generation cost and real power loss as objective functions. Abou El-Elaet al.[23] developed a modified multi-objective fuzzy linear programming optimization (MFLP) algorithm to solve the MOOPF problem by considering generation cost, preventive control action, as well as pre- and post-emergency conditions. Another application of fuzzy logic to the optimum real power dispatch problem, which considered preventive control action constraints, was presented in [24]. MFLP procedures were suggested for multi-objective optimal reactive power optimization [25,26]. Real power losses minimization and voltage stability margin maximization were selected as problem targets in [25]. The cost minimization of new switchable reactive power sources and real power losses were considered as problem objectives in [26]. Lastly, a fuzzy system was used to solve the reactive power control problem in hybrid electrical power systems in [20]. Notably, linear programming formulations have been used to formulate the mathematical framework for the aforementioned fuzzy set approaches because these formulations are fast, reliable, and viable tools for solving power grid online optimization problems that efficiently enforces inequality constraints [27,28].

Considering the aforementioned circumstances occurring in electricity markets and the growing role of decision makers in power systems operations, developing an efficient optimization technique that can solve new models of the MOOFP problem and satisfy the preferences of decision makers, is critical.

A considerable contribution can be made in this field in terms of enhancing exploration capability, modeling new combinations of optimal power flow (OPF) objectives, representing operational constraints, as well as studying the appropriate employing of DG technologies to achieve a better solution to the MOOPF problem.

In this study, an MFLP algorithm that deals with recent substantial developments is proposed to solve a new model of the MOOPF problem that considers a variant combination of objectives with and without optimum DG penetration. In the proposed MFLP algorithm, an extended group of control variables is used. The group comprises real power generation outputs, voltages of generation buses, tap setting of regulating transformers, reactive power of shunt capacitors, as well as active power generation of DG units. Three competing objectives that address these recent conditions are considered for the individual and simultaneous optimization process in this research, namely, minimization of real power loss, maximization of voltage stability margin, and maximization of the MVAR reserve margin of switchable sources. These objectives are fuzzified with suitable membership functions and extreme targets. The system constraints are regarded as hard constraints to maximize exploration capability and satisfy problem objectives. A successive linear programming (SLP) framework is employed to solve the proposed fuzzy approach using the interior-point method (IPM). The suggested MFLP approach coordinate objective functions and enforce the operational constraint strictly to provide the optimal setting of the control variables that achieve a single optimum solution. The IEEE 30-bus and IEEE 118-bus test systems are considered to demonstrate the efficacy of the suggested MFLP optimization algorithm. Different combinations of the three objectives with and without DG effect are solved. The rest of this article is organized as follows. Section 2 expresses the developed mathematical formulation of the MOOPF problem considering DG units parameters. In Section 3, the proposed MFLP optimization technique for solving the MOOPF problem with optimum DG penetration is presented. The simulation results, discussions, and comparisons with approaches reported in the literature are presented and described in Section 4. Lastly, conclusions are drawn in Section 5.

2 Problem Formulation

Basically, multi-objective optimization problems involve minimizing and/or maximizing a set of contradictory objective functions subject to a wide variety of constraints. A single optimum solution with tradeoffs between two or more competing goals is needed [29,30]. This study aims to estimate the optimum adjustment of the control variables in terms of the considered objectives meanwhile achieving a group of equality and inequality constraints. Moreover, DG optimum sizing is considered another objective to obtain a more optimal solution to the MOOPF problem. Thus, DG size is added to the set of control variables.

Table 1 lists the symbols and abbreviations used throughout this paper.

The general mathematical formulation of MOOPF problem is stated as follows: (1)

Subjected to: (2) (3) where fi is the ith objective function, Nobj is the number of objectives, gi(x,u) is the ith equality constraint, and hi(x,u) is the ith inequality constraint. J and H are the number of equality constraints that represent the power flow equations and the number of inequality constraints, respectively. In this paper, we have added DG reactive power generation QDG to the dependent variables. The modified version vector of dependent variables can be expressed as: (4)

In addition, we have added DG real power generation to the control variables. The modified version vector of the control variables consists of real power generation outputs except for slack bus, active power generation of DG units PDG, reactive power outputs of compensator capacitors Qcap, voltages of generation buses VG, and tap setting of regulating transformers units Tap. Hence, u can be represented as: (5)

2.1 Problem objective functions

Based on power utilities selection as well as previously mentioned justification in Section 1 that explains the recent substantial development occurring in the electricity market, three conflicting objectives are considered in the present study to solve the MOOPF problem. These objectives are: real power loss minimization, switchable MVAR sources reserve margin maximization, and voltage stability enhancement maximization. Furthermore, the maximization saving by using DG is implicitly considered as an additional optimization objective in the proposed formulation. A sensitivity-based formula is proposed to identify the candidate location(s) for DG units placement. Meanwhile, DG optimal size is treated as an additional control variable to optimally adjust in the way that produces maximum saving in total cost of power generation. The general mathematical formulation of MOOPF problem that considers maximization of the saving by using DG, which are given in Eqs (13), can be expressed as follows:- (6) (7)

Subjected to: (8) (9)

Detailed explanation which justifies the selection of each considered objective function is given below.

2.1.1 Minimization of real power loss.

The minimization of active power loss Ploss is a widely used objective for the optimal power flow problem [28,31]. Furthermore, it is an essential issue that is frequently considered to enhance power delivery. Thus, minimizing active power loss is the main objective that should be achieved optimally in our work. The real power loss of a meshed power system can be estimated as follows: (10) where N is the total number of power system buses, Gij is the conductance of a transmission line that joins the ith and jth buses, Vi is the voltage magnitude of the ith bus, Vj is the voltage magnitude of the jth bus, and δi and δj are the bus voltage angles at the terminals of the ij transmission line.

2.1.2 Switchable MVAR sources reserve margin maximization.

With the recent growth of loading rates in existing power systems worldwide, the prominence of maximizing the MVAR reserve margin of compensator capacitors has steadily increased. This important goal to satisfy in term of supplying the desired reactive power throughout contingency cases. This objective can be formulated as follows: (11) where Qcapi is the reactive power output of the ith compensator capacitor. Meanwhile, is the upper reactive power limit of the ith compensator capacitor.

2.1.3 Voltage stability enhancement.

Considering voltage stability has become an essential concern in the optimal power flow problem because of the growth of transmission system loading that leads to numerous voltage collapse incidences. To assess the voltage stability of a specified power network, an efficient indicator of the load bus L-index [32] is widely used with consistent results. By employing normal load flow data, the L-index produces a scalar value that varies from 0 (no load) to 1 (voltage collapse). The L-index value indicates the proximity of each load bus to voltage collapse; hence, it determines weak load buses that require MVAR support. The L-index of the kth load bus can be written as follows: (12) where VGj is the voltage of the jth generation bus and VLk is the voltage of the kth load bus. The values of Fjk are fixed for a specific power system configuration which can be computed from the Y bus matrix. Consequently, to preserve voltage stability, the objective should be to minimize the summation of square L-indexes for a given load case, which can be called a voltage stability enhancement index. This index is expressed as follows: (13)

Moreover, a global power network L-index indicating the proximity of the network to voltage collapse can be defined as the maximum of L-indices, i.e.,Lmax. A low Lmax value indicates a high degree of voltage stability.

2.2 Problem constraints

The optimization process involves two main groups of constraints that should be maintained within their limits. These restrictions can be categorized as follows.

2.2.1 Equality constraints.

The equality constraints describe load flow equations that control the power system; they are generally called real and reactive power balance. These constraints can be expressed as follows: (14) (15) where Bij is the susceptance of a transmission line that joins the ith and jth buses, where as δij = δiδj is the voltage angle difference between the ith and jth nodes.

2.2.2 Inequality constraints.

In formulating the optimal power flow problem, a group of inequality constraints are considered. These constraints can be called power system operating constraints, which include the limits of physical devices and the borders formed to maintain system security. In this research, for consistency with the proposed approach, we classify the inequality constraints based on the type of variable; as control variables constraints that belong to u vector Eq (5) and dependent variables constraints which stated in x vector Eq (4). The control variables constraints can be expressed as follows: (16) (17) (18) (19) (20)

While the dependent variables constraints can be described as follows: (21) (22) (23) (24) (25)

3 Proposed MFLP Algorithm for the MOOPF Problem Considering DG

In this section, a MFLP methodology is suggested to solve a new model of the MOOPF problem with and without considering the influence of DG to assess its effect on solution quality and convergence rapidity. This solution is achieved by performing simultaneous optimization for the three competing objective functions that address the aforementioned issues. The challenge is to solve this problem with high satisfaction while achieving optimal power system operation and enforcing security constraints. Hence, these objectives are fuzzified with appropriate membership functions that consider extreme targets. Notably, DG optimal placement is incorporated into the proposed MFLP. The aim is to achieve higher optimality by estimating the optimum capacity for DG.

3.1 Fuzzification of the objective functions

The three nominated objective functions are characterized by their conflicting nature. A minimization membership function is depicted for each of the active power loss and the voltage stability index. Meanwhile, a maximization membership function is used for the shunt MVAR compensators reserve. The objective functions are transformed from crisp values mode into fuzzy membership grades and treated as fuzzy constraints. The membership function of active power loss shown in Fig 1 can be expressed as follows: (26) where is the target value for the real power loss prescribed by the decision maker based on experience and preference, whereas represents the estimated loss value for the initial load flow solution state.

thumbnail
Fig 1. Fuzzy membership function for active power losses minimization.

https://doi.org/10.1371/journal.pone.0149589.g001

Moreover, a fuzzy membership function for the switchable MVAR reserve margin maximization can be depicted as shown in Fig 2. This function is given by (27) where & are the lower as well as the upper MVAR reserve margins for the compensator capacitors that are connected to selected load buses, respectively. Similarly, specifying the values of these parameters depends on the operational experiences of the decision makers.

thumbnail
Fig 2. Fuzzy membership function for switchable VAR sources reserve margin maximization.

https://doi.org/10.1371/journal.pone.0149589.g002

Meanwhile, Fig 3 describes the fuzzy membership function of the VSEI that can be expressed as follows: (28) where VSEImax is the computed voltage stability index for the present operating state, whereas VSEImin is the desired value for the voltage stability index that can be subjectively assigned.

3.2 MFLP optimization model

The basic concept of the suggested methodology is to transform the fuzzy modeling of the MOOPF problem into a crisp model, and thus, obtain an optimal solution that simultaneously optimizes the objectives and strictly enforces all the constraints. In this research, we have treated all the constraints of the control and dependent variables as crisp constraints. This option is suitable when obtaining a high satisfaction for the objective functions by minimizing the number of membership functions during the optimization process is a priority. A satisfaction factor λ represents the optimality degree that is defined as the minimum of all the fuzzy membership functions of the problem objectives is proposed. Based on this scenario, the satisfaction factor formula can be expressed as follows: (29) where λ, μ(Ploss), μ(QCRM), and μ(VSEI) are within the range of [0–1]. The goal is to maximize λ, that is, to maximize the values of the membership functions for the problem objectives symmetrically. A high fuzzy membership function value indicates a high degree of optimality.

Based on the previous statement, the problem of the proposed MFLP approach will be to maximize satisfaction factor. Considering the problem objectives as fuzzy constraints and the system constraints as hard constraints, the general mathematical formulation of MOOPF that considers DG, which are provided in Eqs (69), can be expressed based on Eq (29) as a semi-fuzzy optimal power flow optimization problem with hard constraints as shown below:- (30)

Subject to (31) (32) (33) (34) (35) (36)

This MOOPF problem can be converted into an entirely crisp problem by substituting the membership functions of the objective functions Eqs (2628) into Eqs (3133), respectively. Thus, the problem objectives can be treated as crisp constraints. Moreover, the aforementioned objective can be the minimization of −λ, which is mathematically equivalent to the maximization of λ. An elaborate form of the proposed MFLP model that considers DG can be expressed in terms of problem objectives, control variables, and dependent variables as follows: (37)

Subjected to

  1. (a). Fuzzy objective functions as crisp constraints.
(38)(39)(40)
  1. (b). Control variables crisp constraints that consider DG as stated in Eqs (1620).
  2. (c). Dependent variables crisp constraints that consider DG as shown in Eqs (2125).
  3. (d). Satisfaction factor limits.
(41)

The preceding multi-objective optimization problem can be solved to maximize the satisfaction factor while strictly enforcing the operational constraints by using an efficient SLP technique powered by an efficient interior point method solver.

3.3 Solution procedure for the proposed MFLP approach

The basic steps of the proposed MFLP approach to solve the MOOPF problem that considers DG are outlined below and illustrated in the flowchart presented in Fig 4.

thumbnail
Fig 4. Flowchart of the proposed MFLP algorithm for the MOOPF problem considering DG.

https://doi.org/10.1371/journal.pone.0149589.g004

  1. Step 1. Solve the base case power flow. Estimate the initial values of the objective functions for the current operating state, which include real power loss minimization, shunt capacitors reserve margin maximization, and voltage stability index maximization using Eqs (10), (11), and (13), respectively.
  2. Step 2. Accommodate the DG unit(s) at the candidate location(s) based on the sensitivity of real power losses to both of the injected real and reactive power as shown in the following matrix formula:
(42)

where is the change in real power loss to injected real power through ith bus, whereas represents the change in real power loss to injected reactive power through kth load bus. is the sensitivity of real power loss to voltage angle for the ith bus. is the sensitivity of real power loss to voltage magnitude for the kth load bus.

  1. Step 3. Fuzzify the objective functions in Eqs (2628) based on the initial state conditions and the assigned targets. Specify the control and dependent variables crisp constraints.
  2. Step 4. Linearize the fuzzy objective functions in Eqs (3840) and the crisp constraints in Eqs (1625). The linearized constraints of the objective functions can be expressed as follows:
(43)(44)(45)

where K denotes the iteration number.ΔPloss, ΔQCRM, and ΔVSEI are the incremental real power loss, the change in shunt compensators MVAR reserve, and the incremental voltage stability index, respectively. Each incremental component includes a sensitivity vector that describes the change in objective function to the control variables. These vectors can be formulated as follows: (46) (47) (48)

  1. Step 5. Formulate the proposed MFLP approach to achieve maximum satisfaction.
  2. Step 6. Solve the MFLP problem using an interior point algorithm to determine the optimum increment of the independent variables Δu and the membership satisfaction Δλ. Update the values of the control variables vector u as u(K+1) = u(K)u. Modify the satisfaction factor λ as λ(K+1) = λ(K)λ. Where Δu = [ΔPGi ΔPDGi ΔQcapi ΔVGi ΔTapi]T.
  3. Step 7. Perform load flow using the new values of the control variables. Determine the modified values of the objective functions and DG penetration.
  4. Step 8. Check if Δλ and Δu are less than the assigned tolerance. Otherwise, return to Step 4 until the stopping criterion is achieved.

The above solution procedure can be used for single objective optimization cases. Thus, the proposed MFLP can be named as a fuzzy linear programming (FLP) algorithm.

4 Results and Discussions

To demonstrate the effectiveness of the suggested MFLP technique for the MOOPF problem considering DG, the procedure is applied in the IEEE 30-bus and IEEE 118-bus test systems. As stated previously, three objective functions are regarded to solve the MOOPF problem that considers DG, namely, real loss minimization, voltage stability enhancement, and shunt capacitors MVAR reserve maximization, using the suggested MFLP algorithm. From an economic perspective, certain load bus is suitable for accommodating a single DG unit with a high capacity instead of installing many DG units at several load buses. In this study and based on this concept, a single DG unit is used. A common type of DG unit that can generate real and reactive power is considered during the execution of the proposed MFLP algorithm with 10 MW maximum capacity and 0.85 p.f. Synchronous machines (e.g. reciprocating engines, cogeneration, combustion gas turbine, etc.) are under this category. To compare and assess the efficacy and robustness of the proposed MFLP algorithm with and without the DG effect, simulations are performed for several cases. In this work, the cases are divided into two categories. In the first category, the problem objectives are optimized individually. In the second category, the objectives are optimized simultaneously. To implement the proposed MFLP algorithm in these cases, the maximum and minimum values of the problem fuzzy objectives are required. The values of and VSEImax are obtained from the results of the base case power flow. Meanwhile, an extremely target values for the problem objectives ,VSEImin, and are assigned to investigate the robustness of the proposed approach. In addition, three well-known algorithms are utilized as competitors to solve the multi-objective OPF problem. These algorithms include Non-dominated Sorting Genetic Algorithm-II (NSGA-II) [33], Neighborhood Knowledge-based Evolutionary Algorithm (NKEA) [34], and Differential Evolution (DE) [35]. The proposed work is implemented in the computational environment of MATLAB R2015a and executed on a PC with 2.4 GHz Intel® Core™ i7 CPU and 8 GB RAM. The five considered cases of single and multi-objective optimization are

  1. Case-1. Active power losses minimization.
  2. Case-2. Voltage stability enhancement.
  3. Case-3. Minimization of real power loss and maximization of shunt capacitors MVAR reserve.
  4. Case-4. Minimization of real power loss and the voltage stability index.
  5. Case-5. All objectives are optimized simultaneously.

4.1 IEEE 30-bus test system

The complete data of this system [36] comprise branch parameter, load data, generator data, and the initial setting of the control variables with their corresponding operational constraints. This network consists of 41 transmission lines, 6 generator buses, and 24 load buses. Four branches, namely, (6–9), (6–10), (4–12), and (27–28), are equipped with tap-changing transformers. Meanwhile, load buses 10, 12, 15, 17, 20, 21, 23, 24, and 29 are chosen as locations for the switchable shunt capacitors. Bus 1 is selected as the swing bus and generator buses 2, 5, 8, 11, and 13 are regarded as PV buses. On the one hand, the minimum and upmost boundaries of the voltage magnitude of the generation units and the load buses are set to [0.95, 1.1] p.u and [0.95, 1.05] p.u, respectively. On the other hand, the upper and lower limits for each transformer tap are 0.9 p.u and 1.1 p.u, respectively. The MVAR injected by each capacitor bank is within 0–5 MVAR. Table 2 presents the assigned parameters of the fuzzy membership functions for the problem objectives of the modified IEEE 30-bus test system.

thumbnail
Table 2. Parameters of the fuzzy membership functions for the problem objectives (IEEE 30-bus test system).

https://doi.org/10.1371/journal.pone.0149589.t002

4.1.1 Single objective optimization.

At first, single target optimization is carried out sequentially for each objective function by implementing the proposed FLP algorithm with and without the effect of DG. This issue is important because of several reasons. First, the range of each objective function ( and ) can be identified by decision makers for multi-objective optimization cases as initial and target values of the OPF objectives. Second, this process is useful in investigating conflicts among problem objectives. Finally, this method can be used to validate the outcomes of the DG placement method, study the effect of DG on the solution for the OPF problem for each objective function, and set the control variables. Based on the findings obtained from Eq (42), bus 30 is the most candidate site for DG placement with the highest sensitivity of real power losses to both of the injected real and reactive power which are (-0.1359) and (-0.0477), respectively. Meanwhile, bus 3 is the worst site with the lowest sensitivity of real power losses to both of the injected real and reactive power which are (-0.0391) and (0.006), respectively. In this section, the most candidate site (bus 30) and the worst site (bus 3) are considered for DG placement during the execution of the proposed FLP algorithm with 10 MW maximum capacity and 0.85 p.f. Table 3 shows the optimum settings of the control variables and the values of the objective functions for base case power flow, as well as single objective function optimization cases using the proposed FLP technique without and with DG. A comparison between the results of the proposed FLP algorithm and those of other approaches is presented in Table 4. The following are the studied cases for single objective optimization using the proposed FLP algorithm.

thumbnail
Table 3. Single objective optimization using the proposed FLP technique without and with considering DG (IEEE 30-bus test system).

https://doi.org/10.1371/journal.pone.0149589.t003

thumbnail
Table 4. Comparison of the proposed FLP technique with different algorithms for real power loss minimization (IEEE 30-bus system).

https://doi.org/10.1371/journal.pone.0149589.t004

Case 1: Active power losses minimization.

In this case, only active power loss minimization is considered the objective function. Fig 5 shows the convergence of real power loss minimization using the proposed FLP algorithm without and with considering the DG unit at buses 30 and 3consecutively. The proposed technique completely converges to the optimum solution after only six iterations. Furthermore, Table 3 clearly demonstrates the short computational time of the FLP algorithm, which is determined to be 6.357, 6.567, and 6.654 s when the proposed algorithm is employed without DG, with a DG unit at bus 30, and with a DG unit at bus 3, respectively. Such periods are competitive in solving the OPF problem. As shown in Table 3, the proposed FLP algorithm yields a high satisfaction factor for the extreme target objective function value. These results indicate the efficacy of the proposed FLP algorithm in satisfying the optimum solution with a rapid convergence. The results in Table 3 and Fig 5 demonstrate a significant reduction in real power loss from 5.8482 MW to 3.1797 MW in the case where the proposed FLP is implemented without considering DG. In Table 4, the optimal power loss value estimated by the proposed technique is superior to those obtained using EGA [12], PSO [12], and DE [11]. The predetermined target value for the problem objective leads to the fast identification of the global optima region with enhanced exploration capability. Moreover, we notice that accommodating a DG unit at load bus 30, which is determined as the best bus for DG placement by the sensitivity formula, leads to a considerable reduction in power loss (2.6572MW), a low voltage stability index value (0.0961), a considerable saving in generation cost (38.2292$/h), and a significant increment in shunt capacitors MVAR reserve margin from 9.788 MVAR to 28.72 MVAR. This process is accomplished by generating 8.227 MW and 5.0986 MVAR from the DG unit assigned based on the results of the proposed FLP algorithm. By contrast, 8.6001 MW and 5.3299 MVAR, which are the optimum estimated size of the DG unit placed in bus 3 (i.e., the worst defined location for DG placement), produces insignificant loss reduction (3.2876 MW). This value is not even lower than that obtained for loss reduction without considering DG, that is, 3.1797 MW. These findings prove that the erroneous location of DG may increase loss instead of decrease it, and thus, the DG placement method is validated. Based on the results, the proper allocation of DG units, along with the proposed FLP algorithm, optimally minimize active power loss minimization, considerably enhance power system voltage stability, and maximize shunt capacitors MVAR reserve margin, thus leading to a considerable saving in generation cost.

thumbnail
Fig 5. Convergence plot of real power loss minimization using FLP without and with considering DG.

https://doi.org/10.1371/journal.pone.0149589.g005

Case 2: Voltage stability enhancement.

This case considers the minimization of the voltage stability index as an objective function. The convergence plot of the proposed fuzzy algorithm is illustrated in Fig 6 for voltage stability index minimization without and with using a DG unit at buses 30 and 3sequentially. As shown in the Fig 6, the value of the voltage stability index settles at the minimum point (0.1013) after seven iterations, and this value does not change thereafter when the proposed FLP is used without DG. Furthermore, Table 3 shows that optimizing the voltage stability index results in a slight decrease of 7.37% in power loss and a relatively small reservation of shunt compensators reactive power (2.6047 MVAR). Based on Table 3, in the case where a DG unit is accommodated in bus 30, the proposed algorithm converges to a low voltage stability index value (0.0978) and leads to a considerable decrease of 8.155% in power loss compared with the values obtained from the optimizing voltage stability index without considering DG. Notably, a considerable saving in generation cost (36.636$/h) is achieved in this case. As a test location for DG placement, bus 3 produces an increment of 1.875% in the voltage stability index and a minimal reduction of 2.527% in power loss. The results clearly indicate that the optimum allocation of DG leads to a considerable enhancement of system voltage stability. Table 3 also indicates that DG placement improves the MVAR reserve margin of shunt capacitors. When the proposed FLP algorithm is used without considering DG, the execution time is 6.604 s. Meanwhile, when FLP considers a DG unit in buses 30 and 3, computation time slightly increases to 6.948 s and 7.185 s, respectively. Based on the results in Table 3, high satisfaction factors for the extreme targeted values of VSEI minimization are achieved by using the proposed FLP algorithm without and with considering DG at the optimal location, which reflects the reliability of the proposed approach.

thumbnail
Fig 6. Convergence plot of VSEI using FLP without and with considering DG.

https://doi.org/10.1371/journal.pone.0149589.g006

4.1.2 Multi-Objective optimization.

In this section, three multi-objective optimization combinations are simultaneously solved using the proposed MFLP algorithm. Based on the findings obtained in the previous section, only bus 30 is considered the location for DG after it has been proven to be the best bus for DG accommodation. Similarly, 10 MW maximum capacity and 0.85 p.f are considered for the used DG type. Table 5 presents the optimal value for each objective function, the achieved satisfaction, and the processing time for multi-objective optimization cases using the proposed MFLP algorithm without and with DG effect. A comparison between the obtained results using the proposed MFLP algorithm and other methods is presented in Table 6. On the other hand, emphasis is placed on the comparison between the results obtained using the proposed algorithm without and with considering DG. The objective is to verify the effect of DG on achieving more optimality. In the next subsection, a discussion on the studied cases is presented.

thumbnail
Table 5. Multi-Objective optimization using the proposed MFLP technique without and with considering DG(IEEE 30-bus test system).

https://doi.org/10.1371/journal.pone.0149589.t005

thumbnail
Table 6. Comparison of the proposed MFLP technique with different algorithms for multi-objective optimization cases using the IEEE 30-bus system.

https://doi.org/10.1371/journal.pone.0149589.t006

Case 3: Simultaneous minimization of real power loss and maximization of shunt capacitors MVAR reserve.

In this case, two contending objectives, namely, power loss minimization and shunt compensators MVAR reserve margin maximization, are optimized simultaneously using the proposed MFLP technique. Fig 7(a) and 7(b) illustrate the satisfaction plot of the proposed MFLP approach for these objectives without and with considering a DG unit at bus 30, respectively. According to the convergence graphs (Fig 7(a) and 7(b)), the proposed MFLP method results in high satisfaction for the extreme target objective functions values. The proposed technique completely converges to the optimum solution after only six iterations. Consequently, the computational time required to execute MFLP is 7.378 s and 7.452 s without and with DG, respectively. This computational time for solving optimization problems is short. The results exhibit the speed and superiority of the proposed algorithm compared with other heuristics approaches for solving the MOOPF problem, which require dozens, or even hundreds, of iterations. Table 5 presents the values of the objective functions. The optimum solution achieved is 3.495 MW and 38.27 MVAR, which are equivalent to a 40.23% reduction in loss and 85% savings in shunt compensators MVAR injection. Executing the MFLP algorithm for the same objectives while considering the DG unit at bus 30 provides a considerable reduction in loss of 3.01 MW and significant maximization of shunt compensators MVAR reserve margin of up to 41.18 MVAR, that is, savings of 91.5%. Moreover, a considerable saving in generation cost (42.6608$/h) is obtained. The generation of the optimum real and reactive power of the DG unit at bus 30 is estimated by the proposed MFLP to be 8.9255 MW and 5.5315 MVAR, respectively. The achieved satisfaction is excellent considering the assigned extreme target values. For DG, the outcomes shown in Fig 7(b) and Table 5 indicate the positive effect of utilizing DG when solving this case of multi-objective optimization problems. These results reinforce the validity of DG placement. For comparison and further validation, the obtained solution using the proposed MFLP algorithm is compared with those obtained by (NSGA-II) [33], (NKEA) [34], and (DE) [35] algorithms as shown in Table 6. Notably, the results obtained by the proposed MFLP algorithm are attractive results in terms of solution optimality, convergence, and CPU time. In fact, the execution time of the proposed MFLP algorithm is shorter than those of (NSGA-II) [33], (NKEA) [34], and (DE) [35] which are determined to be 8.75, 10.33, and 14.74 s, respectively. Comparing the results listed in Tables 3 and 5, it can be noted that there is a considerable contradiction for multi-objective optimization. For instance, in case of solving OPF without considering DG, the shunt capacitors MVAR reserve increase to 38.27 MVAR but the real power losses increase to 3.495 MW. Eventually, we can confirm that power loss and shunt capacitors MVAR reserve are conflicting objectives based on the results.

thumbnail
Fig 7. Satisfaction graph of MFLP optimization for loss minimization and shunt compensators MVAR reserve margin maximization.

(a) without considering DG; (b) with a DG unit at bus 30.

https://doi.org/10.1371/journal.pone.0149589.g007

Case 4: Simultaneous minimization of real power loss and the voltage stability index.

In this case, two objectives are considered: minimization of real power loss and the voltage stability index. These two objectives are optimized simultaneously using the proposed MFLP algorithm. Fig 8(a) depicts the satisfaction graph of the proposed MFLP technique for these objectives when optimized simultaneously without considering DG. The unique solution obtained is 3.1994 MW and 0.1248 for power loss and the voltage stability index, respectively, with a high satisfaction of 0.90943. In this case, the proposed MFLP algorithm takes six iterations to converge. Meanwhile, Fig 8(b) shows the convergence graph for the same objectives while accommodating a DG unit at bus 30. The best obtained solution is 2.544 MW and 0.1004, with a remarkable satisfaction of 0.8746, which is superior to the obtained solution without DG in Fig 8(a). Comparing the results listed in Tables 3 and 5, the obtained values for power loss and VSEI that are estimated in Table 5 are close to those obtained after individual optimization (Table 3) without and with DG. The results indicate that these objective functions are slightly conflicting. To determine the efficacy of the proposed MFLP algorithm in optimizing loss and voltage stability, a comparison between the optimum solution obtained by the proposed technique and four heuristics algorithms, namely, FPSO [12], NSGA-II [33], NKEA [34], and DE [35] is conducted. The results of this comparison are presented in Table 6, which shows that the proposed MFLP can provide better results than the other algorithms. Moreover, the results exhibit the speed of the proposed algorithm compared with other heuristics approaches for solving the MOOPF problem, which require dozens of iterations. These findings highlight the potential and superiority of the proposed MFLP algorithm over other methods. Lastly, by comparing the obtained results for this case shown in Table 5, the proposed MFLP algorithm that considers DG converges to lower values of objective functions compared with the MFLP algorithm that does not consider DG effect.

thumbnail
Fig 8. Satisfaction graph of MFLP optimization for loss minimization and voltage stability enhancement.

(a) without considering DG; (b) with a DG unit at bus 30.

https://doi.org/10.1371/journal.pone.0149589.g008

Case 5: All objectives are optimized simultaneously.

In the last case, the three selected competing objective functions for the OPF problem are optimized simultaneously by the proposed MFLP algorithm. Fig 9(a) depicts the satisfaction graph for these objectives without considering DG. Seven iterations of the proposed MFLP are adequate to achieve the desired convergence with a computational time of 7.891 s, which is a short execution time for solving multi-objective optimization problems. As listed in Table 5, the optimum solution attained is 3.298 MW, 0.1061, and 33.22 MVAR, with a considerable satisfaction of 0.806 for the target objectives. Meanwhile, Fig 9(b) presents the satisfaction graph for the same objectives by considering a DG unit at bus 30. Marginally different from the previous condition, the proposed MFLP converges after eight iterations, with a computational time of 8.049 s. In Table 5, the satisfaction factor increases to 0.845 when the proposed MFLP algorithm considers the DG effect. The corresponding best solution obtained is 2.904 MW, 0.1028, and 39.2 MVAR. The optimum saving ingeneration cost is determined to be 42.1408 $/h. This solution is achieved parallel with the injection of optimum real and reactive power generation of the allocated DG unit at bus 30, which are 8.112 MW and 5.02736 MVAR, respectively. Thus, Table 5 indicates that the highest quality solution for optimization loss, MVAR reserve, voltage stability, and saving in generation cost is attained by the proposed algorithm when DG is accommodated at the optimum placement compared with without DG. Once more, the efficiency of the proposed MFLP algorithm in solving multi-objective optimization problems is proven. Furthermore, the role of the robustness of the DG placement formula in producing an enviable solution for the MOOPF problem, together with the proposed MFLP algorithm, has been ascertained. Similarly, the optimum solution obtained by the proposed MFLP algorithm is better than those achieved using (NSGA-II) [33], (NKEA) [34], and (DE) [35]. This finding demonstrates the superiority of the suggested algorithm over heuristics methods. Lastly, we can confirm that power loss, voltage stability and shunt capacitors MVAR reserve are contradictory objectives based on the obtained results in Table 5. Notably, all control and dependent variables remain within their permissible constraints.

thumbnail
Fig 9. Satisfaction graph of MFLP optimization for the three objective functions.

(a) without considering DG; (b) with a DG unit at bus 30.

https://doi.org/10.1371/journal.pone.0149589.g009

4.1.3 Statistical analysis.

To evaluate the robustness and reliability of the proposed MFLP algorithm in solving the MOOPF problem, a statistical study was conducted. In this work, the MFLP was run 10 times for the three considered multi-objective optimization cases, namely, Case 3,Case 4, and Case 5. The extreme target values for the problem objectives , VSEImin, and which are displayed in Table 2 are varied extremely and symmetrically with different step sizes as follows:

  1. In step size of 0.1 MW, the value of varies from 3 MW to 2.1 MW and from 2.5 MW to 1.6 MW when solving OPF without and with considering DG, respectively.
  2. In step size of 0.01, the values of VSEImin vary from 0.12 to 0.03 and from 0.09 to 0.00 when solving OPF without and with considering DG, respectively.
  3. In step size of 1 MVAR, the values of s vary from 40 MVAR to 31 MVAR and from 45 MVAR to 36 MVAR when solving OPF without and with considering DG, respectively.

The used statistical analysis factors for each objective are the best value, the mean value, the worst value, the variance (VR) and the standard deviation (SD). These statistical factors are depicted in Tables 7 and 8 which present the low values of the standard deviation for all considered cases without and with DG, respectively. We notice that the proposed MFLP approach has the ability to settle at the optimum value or very close to it in every run/trial. A gain, this result reveals the effectiveness of the suggested approach in solving optimization problems. Lastly, based on the optimization results (Section 4.1.1 and Section 4.1.2), as well as the statistical analysis results, Fig 10 shows the single line diagram of IEEE 30-bus test system that contains the optimal placement of DG and the locations of reactive power adjustment.

thumbnail
Table 7. Statistical results for the proposed MFLP technique without considering DG(IEEE 30-bus test system).

https://doi.org/10.1371/journal.pone.0149589.t007

thumbnail
Table 8. Statistical results for the proposed MFLP technique with considering DG(IEEE 30-bus test system).

https://doi.org/10.1371/journal.pone.0149589.t008

thumbnail
Fig 10. Single line diagram of IEEE 30-bus test system considering the optimal placement of DG.

https://doi.org/10.1371/journal.pone.0149589.g010

4.2 IEEE 118-bus test system

In order to prove the effectiveness and scalability of the proposed MFLP procedure for large-scale power networks, a standard IEEE 118-bus test network was utilized. The complete data of this system including branch parameter, load data, generator data, and the initial setting of the control variables with their corresponding operational constraints can be found in [37]. This system consists of 186 transmission lines, 54 generator buses, and 64 load buses. Nine branches, namely, (8–5), (26–25), (30–17),(38–37),(63–59),(64–61),(65–66),(68–69), and (81–80), are equipped with tap-changing transformers. Meanwhile, load buses 34, 44, 45, 46, 48, 74, 79, 82,83,105,107, and 110 are chosen as locations for the switchable shunt capacitors. On the one hand, the minimum and upmost boundaries of the voltage magnitude of all buses are set to [0.95, 1.1] p.u. On the other hand, the upper and lower limits for each transformer tap are 0.9 p.u and 1.1 p.u, respectively. The MVAR injected by each capacitor bank is within 0–30 MVAR. Table 9 presents the assigned parameters of the fuzzy membership functions for the IEEE 118-bus test system.

thumbnail
Table 9. Parameters of the fuzzy membership functions for the problem objectives (IEEE 118-bus test system).

https://doi.org/10.1371/journal.pone.0149589.t009

4.2.1 Single objective optimization.

Similarly, single target optimization is performed sequentially for the same objective functions considered in Case 1 and Case 2 by implementing the proposed FLP approach with and without the impact of DG. Based on the findings obtained from Eq (42), bus 106 is the most candidate site for DG placement with the highest sensitivity of real power losses to both of the injected real and reactive power which are (-0.1162) and (-0.0588), respectively. Meanwhile, bus 38 is the worst site with the lowest sensitivity of real power losses to both of the injected real and reactive power which are (-0.0039) and (-0.0001), respectively. In this section, the most candidate site (bus 106) is considered for DG placement during the execution of the proposed FLP algorithm using two DG units with 10 MW maximum capacity and 0.85 p.f. Table 10 shows the values of the objective functions for base case power flow, as well as the test results obtained for single objective function optimization cases using the proposed FLP technique without and with DG. Furthermore, a comparison between the results of the proposed FLP algorithm and three heuristics algorithms, namely, (NSGA-II) [33],(NKEA) [34], and (DE) [35] is presented in Table 11. It can be noted that the suggested MFLP method produces superior results in comparison with the above- mentioned algorithms. This confirms that the suggested MFLP method can be used effectively to solve single objective OPF problems for large-scale power networks.

thumbnail
Table 10. Single objective optimization using the proposed MFLP technique without and with considering DG(IEEE 118-bus test system).

https://doi.org/10.1371/journal.pone.0149589.t010

thumbnail
Table 11. Comparison of the proposed FLP technique with different algorithms for single objective optimization cases using the IEEE 118-bus system.

https://doi.org/10.1371/journal.pone.0149589.t011

4.2.2 Multi-Objective optimization.

For an extensive validation of the proposed MFLP algorithm, the same three multi-objective optimization combinations as used in 30-bus test network are considered. Similarly, bus 106 is selected as a location for DG placement. Table 12 expresses the optimal value for each objective function, the achieved satisfaction, and the processing time for multi-objective optimization cases using the proposed MFLP algorithm without and with DG effect. Notably, the proposed MFLP algorithm that considers DG achieves more optimal solution compared with the MFLP algorithm that does not consider the DG effect. Comparing the results listed in Tables 10 and 12, a considerable contradiction for multi-objective optimization is noted. Furthermore, a comparison between the obtained results using the proposed MFLP algorithm and the same competitors is presented in Table 13. Obviously, the obtained results by the proposed MFLP are attractive in terms of solution superiority, convergence, and CPU time. Notably, the results demonstrate the speed of the proposed MFLP algorithm compared with other heuristics approaches for solving the MOOPF problem, which require dozens, or even hundreds, of iterations. This proves its efficacy, applicability, and potential in solving multi-objective OPF problems for large-scale power networks.

thumbnail
Table 12. Multi-Objective optimization using the proposed MFLP technique without and with considering DG(IEEE 118-bus test system).

https://doi.org/10.1371/journal.pone.0149589.t012

thumbnail
Table 13. Comparison of the proposed MFLP technique with different algorithms for multi-objective optimization cases using the IEEE 118-bus system.

https://doi.org/10.1371/journal.pone.0149589.t013

5 Conclusions

This study proposes an efficient MFLP approach to solve the MOOPF problem in mesh-connected power systems without and with considering the effect of DG. Simultaneously, three objectives, namely, power loss minimization, voltage stability enhancement, and shunt compensators MVAR margin maximization, are considered for optimization. The optimum placement of DG units is identified using a sensitivity based-method. The results indicate the competence of the used technique. Meanwhile, the task of finding the optimal DG size is performed by the proposed MFLP approach by considering the generated real power of DG as control variable. The proposed MFLP technique has been scrutinized and validated using the IEEE 30-bus and IEEE 118-bus test systems. The results indicate that a unique and optimum solution with an excellent satisfaction for the targets of the decision makers can be achieved within a short computational time by the proposed MFLP algorithm despite the extreme assigned targets without and with considering DG. The predetermined target value for the problem objective leads to the fast identification of the global optima region with enhanced exploration capability. The findings illustrate the efficacy and reliability of the proposed MFLP technique. In addition, compared with the results in literature, the proposed technique outperforms other heuristics algorithms in terms of solution optimality in several cases of single/multiple objective optimization. Employing the MFLP technique with the proper placement of DG results in higher optimality for the values of problem objectives compared with performing it without considering DG. DG extensively affects power loss minimization and shunt capacitors MVAR reserve margin maximization. Furthermore, a considerable saving in generation cost is achieved. In conclusion, the results show significant and desirable loss reduction, MVAR reserve, and improved voltage stability margin by using the proposed MFLP algorithm without and with considering DG. The proposed approach is convenient for online implementation in real power system operation in term of high satisfaction for the assigned targets of decision makers, distinct convergence property, high exploration capability, and rigid enforcement of system constraints.

Acknowledgments

The authors gratefully acknowledge the University Putra Malaysia, Faculty of Engineering, Department of Electrical and Electronic Engineering, for providing the necessary facilities. The author Warid Warid would like to thank the Iraqi Ministry of Higher Education & Scientific Research, Foundation of Technical Education and Southern Technical University for the unceasing encouragement, support and attention.

Author Contributions

Conceived and designed the experiments: WW HH NM NIA. Performed the experiments: WW. Analyzed the data: WW. Contributed reagents/materials/analysis tools: WW. Wrote the paper: WW. Established and validated the models: WW. Provided ideas for the discussion: HH NM NIA. Reviewed the paper: WW HH NM NIA.

References

  1. 1. Hazra J, Sinha AK. A multi-objective optimal power flow using particle swarm optimization. European Transactions on Electrical Power. 2011;21(1):1028–45.
  2. 2. Chen H, Bo ML, Zhu Y. Multi-hive bee foraging algorithm for multi-objective optimal power flow considering the cost, loss, and emission. International Journal of Electrical Power & Energy Systems. 2014;60:203–20.
  3. 3. Khorsandi A, Hosseinian SH, Ghazanfari A. Modified artificial bee colony algorithm based on fuzzy multi-objective technique for optimal power flow problem. Electric Power Systems Research. 2013;95: 206–13.
  4. 4. Yamashita K, Joo S-K, Li J, Zhang P, Liu C-C. Analysis, control, and economic impact assessment of major blackout events. European Transactions on Electrical Power. 2008;18(8):854–71.
  5. 5. Dong F, Chowdhury BH, Crow ML, Acar L. Improving voltage stability by reactive power reserve managment. IEEE Transactions on power Systems.2005;20(1): 338–45.
  6. 6. Alizadeh Mousavi O, Bozorg M, Cherkaoui R. Preventive reactive power management for improving voltage stability margin. Electric Power Systems Research. 2013;96:36–46.
  7. 7. Ghosh S, Ghoshal SP, Ghosh S. Optimal sizing and placement of distributed generation in a network system. International Journal of Electrical Power & Energy Systems. 2010;32(8):849–56.
  8. 8. Sheng W, Liu K-y, Cheng S. Optimal power flow algorithm and analysis in distribution system considering distributed generation. IET Generation, Transmission & Distribution. 2014;8(2):261–72.
  9. 9. Abido MA. Multiobjective evolutionary algorithms for electric power dispatch problem. IEEE Transactions on Evolutionary Computation. 2006;10(3):315–29.
  10. 10. Chen YL, Ke YL. Multi-objective VAr planning for large-scale power systems using projection-based two-layer simulated annealing algorithms. IEE Proceedings—Generation, Transmission and Distribution. 2004; 151(4):555–560.
  11. 11. Abido MA, Al-Ali NA. Multi-objective differential evolution for optimal power flow. In Proceedings of the IEEE International Conference on Power Engineering, Energy and Electrical Drives (POWERENG 2009), Lisbon, Portugal, 18–20 March 2009; pp. 101–106. https://doi.org/10.1109/POWERENG.2009.4915212
  12. 12. Kumari MS, Maheswarapu S. Enhanced Genetic Algorithm based computation technique for multi-objective Optimal Power Flow solution. International Journal of Electrical Power & Energy Systems. 2010;32(6):736–42.
  13. 13. Medina MA, Coello CA, Ramirez JM. Reactive power handling by a multi-objective teaching learning optimizer based on decomposition. IEEE Transactions on power Systems.2013; 28(4): 3629–37.
  14. 14. Zhou B, Chan KW, Yu T, Wei H, Tang J. Strength Pareto multigroup optimizer for multi-objective optimal reactive power dispatch. IEEE Transactions on Industrial Informatics.2014; 10(2): 1012–22.
  15. 15. Frank S, Steponavice I, Rebennack S. Optimal power flow: a bibliographic survey II. Energy Systems. 2012;3(3):259–89.
  16. 16. Niknam T, Narimani MR, Abarghooee RA, Firouzi BB. Multiobjective optimal reactive power dispatch and voltage control: A new opposition-based self-adaptive modified gravitational search algorithm. IEEE Systems Journal.2013;7(4): 742–53.
  17. 17. Liu L, Wang X, Ding X, Chen H. A robust approach to optimal power flow with discrete variables. IEEE Transactions on power Systems.2009;24(3): 1182–90.
  18. 18. Younes M, Khodja F, Kherfane RL. Multi-objective economic emission dispatch solution using hybrid FFA (firefly algorithm) and considering wind power penetration. Energy. 2014;67:595–606.
  19. 19. Khorsandi A, Alimardani A, Vahidi B, Hosseinian SH. Hybrid shuffled frog leaping algorithm and Nelder—Mead simplex search for optimal reactive power dispatch. IET Generation, Transmission & Distribution. 2011;5(2):249.
  20. 20. Taghavi R, Seifi AR, Pourahmadi-Nakhli M. Fuzzy reactive power optimization in hybrid power systems. International Journal of Electrical Power & Energy Systems. 2012;42(1):375–83.
  21. 21. El Sehiemy R, Shaheen A, Abou El-Ela A. Multi-objective fuzzy-based procedure for enhancing reactive power management. IET Generation, Transmission & Distribution. 2013;7(12):1453–60.
  22. 22. Bansal RC. Bibliography on the fuzzy set theory applications in power systems (1994–2001). IEEE Transactions on power Systems.2003; 18(4): 1291–99.
  23. 23. Abou El-Ela AA, Bishr MA, Allam SM, El-Sehiemy RA. An emergency power system control based on the multi-stage fuzzy based procedure. Electric Power Systems Research. 2007; 77(5–6): 421–9.
  24. 24. El-Ela AAA, Bishr M, Allam S, El-Sehiemy R. Optimal preventive control actions using multi-objective fuzzy linear programming technique. Electric Power Systems Research. 2005;74(1):147–55.
  25. 25. Venkatesh B, Sadasivam G, Khan MA. A new optimal reactive power scheduling method for loss minimization and voltage stability margin maximization using successive multi-objective fuzzy LP technique. IEEE Transactions on power Systems.2000; 15(2):844–851.
  26. 26. Venkatesh B, Sadasivam G, Khan MA. An efficient multi-objective fuzzy logic based successive LP method for optimal reactive power planning. Electric Power Systems Research.2001; 59(2):89–102.
  27. 27. Elsaiah S, Benidris M, Cai N, Mitra J. Fast economic power dispatch method for power system planning studies. IET Generation, Transmission & Distribution. 2015;9(5):417–26.
  28. 28. Frank S, Steponavice I, Rebennack S. Optimal power flow: a bibliographic survey I. Energy Systems. 2012;3(3):221–58.
  29. 29. Xiaosong H, Jiuchun J, Egardt B, Dongpu C. Advanced power-source integration in hybrid electric vehicles: multicriteria optimization approach. IEEE Transactions on Industrial Electronics. 2015;62(12):7847–58.
  30. 30. Xiaosong H, Hector EP, Scott JM, Dongpu C. Battery Charge Control With an Electro-Thermal-Aging Coupling. In ASME 2015 Dynamic Systems and Control Conference, pp. V001T13A002. American Society of Mechanical Engineers, 2015.
  31. 31. Soliman SA, Mantawy AH. Modern Optimization Techniques with Applications in ElectricPower Systems, 2012 ed.; Publisher: Springer Science+Business Media, LLC, 233 Spring Street, New York, NY 10013, USA; pp. 281–292. https://doi.org/10.1007/978-1-4614-1752-1
  32. 32. Thukaram BD, Parthasarathy K. Optimal reactive power dispatch algorithm for voltage stability improvement. International Journal of Electrical Power & Energy Systems.1996;18(7):461–468.
  33. 33. Deb K, Pratap A, Agarwal S, Meyarivan T. A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Transactions on Evolutionary Computation. 2002; 6(2): 182–197.
  34. 34. Yu Z, Wong HS, Wang D, Wei M. Neighborhood knowledge-based evolutionary algorithm for multiobjective optimization problems. IEEE Transactions on Evolutionary Computation. 2011; 15(6): 812–831.
  35. 35. Storn R, Price K. Differential evolution—a simple and efficient adaptive scheme for global optimization over continuous spaces. Technical Report TR 95–012. 1995; Berkley, USA: International Computer Science Institute.
  36. 36. Lee KY, Park YM, Ortiz JL. A united approach to optimal real and reactive power dispatch. IEEE Transactions on Power Apparatus and Systems. 1985;PAS-104(5): 1147–53.
  37. 37. The IEEE 118-Bus Test System. Available at:http://www.ee.washington.edu/research/pstca/pf118/pg_tca118bus.html.